Phandar Hydropower
The project is located on Ghizer River near Phandar Lake to Chhashi Gol, 160 km North-West of Gilgit-Chitral Road and 772 km from Islamabad.It has an installed capacity of 80 MW and annual energy generation of 374 GWh.
The project is located on Ghizer River near Phandar Lake to Chhashi Gol, 160 km North-West of Gilgit-Chitral Road and 772 km from Islamabad.It has an installed capacity of 80 MW and annual energy generation of 374 GWh.
The project is located on Basho Lungma (Nullah) near Basho Village, 45 km downstream of Skardu Town. Basho Lungma is a left tributary of Indus River and is 704 km from Islamabad. (Gilgit-Baltistan). Salient Features: Design Discharge 5.0 m3/sec Gross Head 974 m Installed Capacity 40 MW Annual Energy 165 GWh
The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020. Salient Features: Design Discharge 3,400 m3/sec Gross Head 159 m Installed Capacity
The project is located on On Indus River about 3 km upstream of village Patan, 5km downstream of Keyal Khwar in KP Province. The powerhouse is situated on the left bank near Patan Village, 305 Km from Islamabad. It has a proposed installed capacity of 2400 MW and annual energy generation of 12,500 GWh.
Location: ​Skardu Dam site is located on Indus river, 35 Km downstream of the Skardu city and 5 km downstream of Ayub Bridge.​​ Salient Features: Dam Height 120 m Normal Reservoir Level 2220 m a.s.l Minimum Reservoir Level 2180 m a.s.l Gross Storage 4.4 MAF Trail Water Level 2110 m a.s.l Gross Head 110 m
The dam is located on Shyok River about 3 km upstream of Khaplu Town, Ghanche District, which is under the administration of the Baltistan Division, Gilgit Baltistan. With a commencement date of March 2016, the project is planned to be completed by June 2020 according to feasibility study. Dam Type Earth Core Rockfill Dam
The Project is located on Deosai Plain at an altitude 3,962 m.a.s.l (13,000 ft.) which is about 27 km (16.7 miles) from the Satpara Dam Project, and 6 km (3.7 miles) south of Skardu Town. It hasan expected completion date of December 2023. The objectives of the project are to increase availability of flows during
The Project area lies on River Indus between Kotri Barrage & Indus River outfall into the Arabian Sea. The barrage site is proposed to be located about 45 Km upstream Indus River outfall into the sea, 10 Km east of Baghan village, 65 km south of Thatta City & 120 km east of Karachi City,
The dam site is located at a distance of about 2.0 Km from East side of Papin village and 50.0 Km South West of Rawat Town, Tehsil & District Rawalpindi on Wadala Kas, a tributary of Soan River. Salient Features: Dam Type Concrete Gravity Height of Dam 111 ft Gross Storage Capacity 89,600 AF Live
The dam is located on Khora River near existing Zam Burg Tower, 69 Km South West of D.I Khan District in Khyber Pakhtunkhwa Province and has not yet been commenced. Salient Features: Type of Dam Asphalt-Concrete faced Rock fill Height of Dam 154 ft Gross Storage 69,739 AF Live Storage 40,662 AF CCA 15, 345