Operational Projects

Darawat Dam

This project is located on Nai Baran River near Jhangri village, about 70 km west of Hyderabad and 135 km North East of Karachi in Thatta / Jamshoro Districts of Sindh, Province. Completed in 2014, this project has live storage of 89,200 AF. Salient Features: Type of Dam Concrete Gravity Dam Height of Dam 151 […]

Operational Projects

Allai Khwar

The project is located on On Allai Khwar, left tributary of Indus River near Besham in District Battagram, Khyber Pakhtunkhwa and was completed in 2013. With an installed capacity of 121 MW, the plant will generate 463 GWh/annum of electricity. Salient Features: Dam Height 32.50 m Length of Headrace Tunnel 2366 m Gross Head 697 m

Operational Projects

Gomal Zam Dam

Located on Gomal River in South Waziristan and West of Tank and D.I.Khan Districts of Khyber Pakhtunkhwa, Gomal Zam Dam has a generation capacity of 17.4 MW. It was completed in June 2013. It is a RCC Curved Gravity Dam with a height of 437ft and 758ft.These are the main features of the dam: Length

Operational Projects

Satpara Dam

Project was built on Satpara Nullah near Skardu, Gilgit-Baltistan, about 6 miles south of Skardu Town and was completed in 2013 Dam Type Earth Fill Height of Dam 128 Ft Length of Dam 560 Ft Power Generation 17.3 MW (105.51 GWh)

Operational Projects

Mirani Dam

Located on river Dasht, about 40 km West of Turbat, District Kech, Balochistan, this dam has live storage capacity of 0.152 MAF and was completed in July 2007. Salient Features: Dam Type Concrete Faced, Rock Fill Dam (CFRD) Height of Dam  127 ft Length of Dam  3,080 ft Gross Storage  0.302 MAF Live Storage  0.152

Operational Projects

Chashma Hydel Power

Chashma Hydel Power Station is located on the right abutment of Chashma Barrage. The barrage is located on the Indus River near the village of Chashma in Mianwali District, which is about 30 Km south of Mianwali, 11 Km south west of Kundian Railway Junction and about 304 Km North West of Lahore. It is

Future Construction

Mangla Marala Link Canal Project

The proposed Canal will off-take from the existing Bong Canal in District Mirpur, Azad Jammu & Kashmir (AJ&K). Canal Head Regulator will be located about 8 km downstream of Mangla Dam on New Bong Canal adjacent to Upper Jhelum Canal (UJC). Expected commencement date is January 2019 and it is to be completed by December

Future Construction

Yulbo HPP

Yulbo HPP ​The proposed dam site is located about 6 km upstream of Silbu and Hilbu villages and about 1.0 km downstream of Astaknala. The powerhouse site is to be located 15 km downstream of dam site and 630 km from Islamabad. Salient Features: Dam Type Rock-Fill with Concrete Face or Concrete Gravity Dam Power

Future Construction

Tungus Hydropower

The project area is located in a largely unpopulated area of Rondu valley, district Skardu. The dam site was identified on Indus River 54 km downstream of Skardu city and 0.5 km upstream of Tungas village. The powerhouse site is to be located 15 km downstream of dam site and 3 km upstream of Dambu

Future Construction

Attabad Lake Hydropower Project

The project is located on Hunza River, 27 km upstream of Aliabad ,130 km from Gilgit and 740 km North East of Islamabad.​​ Salient Features: Intake Gated Intake Tunnel Length 2.3 km (dia 5.5 m) Gross Head 111.7 m Generation Capacity 54 MW Annual Energy 373.69 GWh