The Project is located on the right side of existing Jinnah Barrage, 5 km from Kalabagh town in District Mianwali and 234 km from Islamabad. It has an installed capacity of 96 MW with mean annual energy generation of 688 GWh.
Salient Features:
| Installed Capacity | 96 MW |
| Mean Annual Energy | 688 GWh |
| Design Discharge | 2400 m3/sec |
| Gross Head | 4.88 m |
| No. & Type of Turbine | 8-Pit Type |
​
