Golen Gol HydroPower

Located on Golen Gol River, a major tributary of Mastuj River in the District Chitral of KP, Golen Gol Project was completed in 2013 and has an installed capacity of 108 MW.

Weir Height12m
Head Race Tunnel Length3.8 Km
Gross Head436m
Design Discharge30 m3/sec
Installed Capacity108 MW
Annual Energy442 GWh