Kurram Tangi Dam Project

The project is located on Kurram river in District North Waziristan, KP (previously FATA) about 14 km upstream of Kurram Garhi Headworks and 32 Km North of Bannu District.Completion of Stage 1 of this project is proposed to be in December 2023.

Height of Kaitu weir13 ft.
Feeder Tunnel Discharge Capacity633.4 cusecs
Spaira Ragha Canal (CCA)  4,080 Acres
Sheratalla Canal (CCA) 12,300 Acres
Installed Capacity 18.4 MW
Annual Energy 79 GWh

​

Scroll to Top