Operational Projects

Hub Dam

The preliminary works of Hub Dam, built across the River Hub, were commenced in September, 1963 and completed in June, 1981. The project was meant to construct a storage reservoir for regulating the flows of Hub River for the purpose of municipal, industrial water supply and irrigation releases to Karachi in Sindh and Lasbela District […]

Future Construction

Bhimber Dam Project

The project is located on Bhimber Nullah about 10 km u/s of Bhimber-Gujrat Road Bridge in District Bhimber, Azad Kashmir. The proposed commencement date is January 2023 and it is to be completed by December 2025. Salient Features: Type of Dam Earth & Rockfill Height of Dam 200 ft (60.96 m) Gross Storage 40,000 AF

Operational Projects

Ghazi Barotha HydroPower

With generation capacity of 1450 MW and an average energy output of 6600 GWh, Ghazi Barotha Hydropower Project is located on the Indus river downstream of Tarbela Dam in District Attock (Punjab) 92.7 KM from Islamabad. The project was completed during the fiscal year 2003-2004. This is a major run of river and environmentally sustainable

Future Construction

Chiniot Dam Project

The dam site is located on Chenab river about 5 km from the Chiniot city, District Chiniot and approximately 100 meter u/s of existing Railway Bridge. With a detailed engineering design, the project is proposed to be completed in December 2023. Salient Features: Type of Dam Earth Rockfill Height of Dam 17 m (55.78 ft.)

Operational Projects

Warsak Dam

Warsak Power Station is a monument of the friendship of Canada and Pakistan. This Hydroelectric Project is located on River Kabul at about 30 KM from Peshawar in District Peshawar (KPK). Warask Hydroelectric Power Project was completed under Colombo Plan in two phases, financed by Canadian Government. Construction of 1st phase started in 1951 and

Operational Projects

Mangla Dam

Mangla Dam Project was actually conceived in 1950’s as a multipurpose project to be constructed at a place called Mangla on river Jhelum located about 30 km upstream of Jhelum city (120 km from Capital Islamabad). The initial investigation and its feasibility studies were completed in 1958. Later on, the project was included in the

Operational Projects

Tarbela Dam

Tarbela Dam is one of the world’s largest earth and rock filled dam and greatest water resources development project which was completed in 1976 as a component of Indus Basin Project. The Dam is located on the river Indus known as the “Abbasin” or the father of the river at a distance of 130 KM

Future Construction

Harpo

Harpo is located on Harpo Nullah, a left tributary of Indus River, about 75 km north west of Skardu District, Gilgit-Baltistan and 670 km North-east of Islamabad. While Phase 1 was completed in December 2022, Phase 2 is still under construction. Design Discharge 5.8 m3/sec Installed Capacity 34.5 MW Annual Energy 170 GWh   

Under Construction

Kachhi Canal Project

Off takes from Taunsa Barrage, Punjab: Muzaffargarh, D.G.Khan, Rajanpur Districts. Balochistan: Dera Bugti, Nasirabad, Bolan, Jhal Magsi Districts. The main aim of the project is to irrigate Agricultural production, resulting in a boost to the economy, improvements in the physical environment including the atmosphere, climate, land, and water, improvement in the quality of life due to betterment in socio-cultural

Under Construction

Keyal Khwar HydroPower

The Project is located on Keyal Khwar Nallah, a right bank tributary of the Indus River in Lower Kohistan District of Khyber Pakhtunkhwa, situated at a distance of 310 km from Islamabad on Karakoram Highway. It was completed in 2016 with an installed capacity of 128 MW and annual energy generation of 418 GWh. Salient