Operational Projects

Mangla Dam

Mangla Dam Project was actually conceived in 1950’s as a multipurpose project to be constructed at a place called Mangla on river Jhelum located about 30 km upstream of Jhelum city (120 km from Capital Islamabad). The initial investigation and its feasibility studies were completed in 1958. Later on, the project was included in the […]

Operational Projects

Tarbela Dam

Tarbela Dam is one of the world’s largest earth and rock filled dam and greatest water resources development project which was completed in 1976 as a component of Indus Basin Project. The Dam is located on the river Indus known as the “Abbasin” or the father of the river at a distance of 130 KM

Future Construction

Harpo

Harpo is located on Harpo Nullah, a left tributary of Indus River, about 75 km north west of Skardu District, Gilgit-Baltistan and 670 km North-east of Islamabad. While Phase 1 was completed in December 2022, Phase 2 is still under construction. Design Discharge 5.8 m3/sec Installed Capacity 34.5 MW Annual Energy 170 GWh   

Under Construction

Kachhi Canal Project

Off takes from Taunsa Barrage, Punjab: Muzaffargarh, D.G.Khan, Rajanpur Districts. Balochistan: Dera Bugti, Nasirabad, Bolan, Jhal Magsi Districts. The main aim of the project is to irrigate Agricultural production, resulting in a boost to the economy, improvements in the physical environment including the atmosphere, climate, land, and water, improvement in the quality of life due to betterment in socio-cultural

Under Construction

Keyal Khwar HydroPower

The Project is located on Keyal Khwar Nallah, a right bank tributary of the Indus River in Lower Kohistan District of Khyber Pakhtunkhwa, situated at a distance of 310 km from Islamabad on Karakoram Highway. It was completed in 2016 with an installed capacity of 128 MW and annual energy generation of 418 GWh. Salient

Under Construction

Mohmand Dam

Located on Swat River about 5 km upstream of Munda Head Works in Mohmand Tribal District, KP, this project has a proposed completion date of December 2025.The main objectives of the dam are to mitigate the risk of floods, irrigate agricultural land of 16,737 acres, hydropower generation and socio-economic uplift of people of the area.

Under Construction

Tarbela 5th Extension

Tarbela Dam is located on on Indus River, District Swabi, Khyber Pakhtunkhwa. Tunnel 5 was constructed for the generation of hydropower, employment generation during construction & O&M of the project, development of fisheries and to reduce load shedding. It was completed in May 2026 with a generation capacity of 1530 MW and annual energy of