Under Construction

Kachhi Canal Project

Off takes from Taunsa Barrage, Punjab: Muzaffargarh, D.G.Khan, Rajanpur Districts. Balochistan: Dera Bugti, Nasirabad, Bolan, Jhal Magsi Districts. The main aim of the project is to irrigate Agricultural production, resulting in a boost to the economy, improvements in the physical environment including the atmosphere, climate, land, and water, improvement in the quality of life due to betterment in socio-cultural […]

Under Construction

Keyal Khwar HydroPower

The Project is located on Keyal Khwar Nallah, a right bank tributary of the Indus River in Lower Kohistan District of Khyber Pakhtunkhwa, situated at a distance of 310 km from Islamabad on Karakoram Highway. It was completed in 2016 with an installed capacity of 128 MW and annual energy generation of 418 GWh. Salient

Under Construction

Mohmand Dam

Located on Swat River about 5 km upstream of Munda Head Works in Mohmand Tribal District, KP, this project has a proposed completion date of December 2025.The main objectives of the dam are to mitigate the risk of floods, irrigate agricultural land of 16,737 acres, hydropower generation and socio-economic uplift of people of the area.

Under Construction

Tarbela 5th Extension

Tarbela Dam is located on on Indus River, District Swabi, Khyber Pakhtunkhwa. Tunnel 5 was constructed for the generation of hydropower, employment generation during construction & O&M of the project, development of fisheries and to reduce load shedding. It was completed in May 2026 with a generation capacity of 1530 MW and annual energy of

Under Construction

Dasu Dam Project

4320 MW-Dasu Hydropwer Project is planned to be completed in two stages. At present, WAPDA is constructing Stage-1 with installed capacity of 2160 MW and annual generation of 12 billion units low-cost and environment-friendly electricity. World Bank is providing financial assistance worth US$ 1.57 billion for the Stage-1, which is likely to start electricity generation

Under Construction

Diamer Basha Dam Project

Diamer Basha Dam Project: Mighty River Indus being successfully passed through the River Diversion System at the Main Dam site during the current high-flow season. The River Diversion System comprises of the Diversion Tunnel and the Diversion Canal. Location In Indus River near Chilas (Khyber Pakhtunkhwa & Gilgit-Baltistan), 315 km u/s from Tarbela Dam and

Scroll to Top