Ready For Construction

Chashma Right Bank Canal Project (LIFT-CUM-GRAVITY)

Location: ​The proposed project is located on the right bank of Indus River in D.I. Khan District, KP Salient Features: Feeder Canal Capacity 2613 Cusecs Length ​21 Miles​ Pumping Station Capacity ​2533 Cusecs​ Length ​64 ft​ ​Pumping Units​ ​​8 Units​​ Capacity 6×353 cfs & 2×212 cfs​ Type ​Vertical mixed flow pump​ ​​​Main Canal (Gravity)​ Capacity […]

Ready For Construction

Lower Palas Valley (Chor Nullah) Hydropower

The project is located on the left tributary of Indus River,12 km upstream of Patan Town, Khyber Pakhtunkhwa close to Duber Khwar and 335 km from Islamabad. The proposed installed capacity is 665 MW with annual energy generation of 2590 GWh

Ready For Construction

Lower Spat Gah

The project is located the left tributary of Indus River, located at 8 km downstream of Dasu town Khyber Pakhtunkhwa, 35 km upstream of Patan town and 365 km from Islamabad. Design Discharge 81 m3/sec Installed Capacity 496 MW Annual Energy 2,007 GWh

Ready For Construction

Bunji

This project is located on Indus River upstream of its confluence with Gilgit river, about 83 Km from Gilgit and 610 km from Islamabad. (Gilgit-Baltistan). It is ready for construction with completion date set to be 9 years from commencement. Installed capacity is planned to be 7100 MW while annual energy generated will be 24,760

Ready For Construction

Naulong Dam Project

Located on Mula River at Sunt about 30 km from Gandawa City in District Jhal Magsi of Balochistan Province, this project has not yet commenced. Salient Features: Type of Dam Zone Earth fill Height of Dam 186 ft. Length of Dam 2,996 ft. Gross Storage 242,163 AF Live Storage   199,956 AF Power Generation 4.4 MW

Scroll to Top