Operational Projects

Allai Khwar

The project is located on On Allai Khwar, left tributary of Indus River near Besham in District Battagram, Khyber Pakhtunkhwa and was completed in 2013. With an installed capacity of 121 MW, the plant will generate 463 GWh/annum of electricity. Salient Features: Dam Height 32.50 m Length of Headrace Tunnel 2366 m Gross Head 697 m […]

Operational Projects

Gomal Zam Dam

Located on Gomal River in South Waziristan and West of Tank and D.I.Khan Districts of Khyber Pakhtunkhwa, Gomal Zam Dam has a generation capacity of 17.4 MW. It was completed in June 2013. It is a RCC Curved Gravity Dam with a height of 437ft and 758ft.These are the main features of the dam: Length

Operational Projects

Satpara Dam

Project was built on Satpara Nullah near Skardu, Gilgit-Baltistan, about 6 miles south of Skardu Town and was completed in 2013 Dam Type Earth Fill Height of Dam 128 Ft Length of Dam 560 Ft Power Generation 17.3 MW (105.51 GWh)

Operational Projects

Mirani Dam

Located on river Dasht, about 40 km West of Turbat, District Kech, Balochistan, this dam has live storage capacity of 0.152 MAF and was completed in July 2007. Salient Features: Dam Type Concrete Faced, Rock Fill Dam (CFRD) Height of Dam  127 ft Length of Dam  3,080 ft Gross Storage  0.302 MAF Live Storage  0.152

Operational Projects

Chashma Hydel Power

Chashma Hydel Power Station is located on the right abutment of Chashma Barrage. The barrage is located on the Indus River near the village of Chashma in Mianwali District, which is about 30 Km south of Mianwali, 11 Km south west of Kundian Railway Junction and about 304 Km North West of Lahore. It is

Operational Projects

Neelum Jhelum

The Project diverts Neelum river water through tunnels at Nauseri about 41 km upstream of Muzaffarabad and out falling in Jhelum River near Chatter Kalas in AJ&K, where the powerhouse is located. With an installed capacity of 969 MW, the dam produces annual energy of 5150 GWh and was completed in 2018. Dam Type Composite

Operational Projects

Hub Dam

The preliminary works of Hub Dam, built across the River Hub, were commenced in September, 1963 and completed in June, 1981. The project was meant to construct a storage reservoir for regulating the flows of Hub River for the purpose of municipal, industrial water supply and irrigation releases to Karachi in Sindh and Lasbela District

Operational Projects

Ghazi Barotha HydroPower

With generation capacity of 1450 MW and an average energy output of 6600 GWh, Ghazi Barotha Hydropower Project is located on the Indus river downstream of Tarbela Dam in District Attock (Punjab) 92.7 KM from Islamabad. The project was completed during the fiscal year 2003-2004. This is a major run of river and environmentally sustainable

Operational Projects

Warsak Dam

Warsak Power Station is a monument of the friendship of Canada and Pakistan. This Hydroelectric Project is located on River Kabul at about 30 KM from Peshawar in District Peshawar (KPK). Warask Hydroelectric Power Project was completed under Colombo Plan in two phases, financed by Canadian Government. Construction of 1st phase started in 1951 and

Operational Projects

Mangla Dam

Mangla Dam Project was actually conceived in 1950’s as a multipurpose project to be constructed at a place called Mangla on river Jhelum located about 30 km upstream of Jhelum city (120 km from Capital Islamabad). The initial investigation and its feasibility studies were completed in 1958. Later on, the project was included in the