Future Construction

FEASIBILITY STUDY, DETAILED ENGINEERING DESIGN, TENDER DOCUMENTS AND PC-I FOR CONSTRUCTION OF DRAINAGE NETWORK IN TALUKA UBAURO, DAHARKI, KHANGARH, MIRPUR MATHELO OF DISTRICT GHOTKI SINDH

Location Taluka Ubauro, Daharki, Khangarh, Mirpur Mathelo, Ghotki District of Sindh province. Scope of Work To procure the Consultants for preparation of Feasibility Study for developing surface drainage network in the different areas of District Ghotki and disposal of SCARP-VI effluent to cater water logging and salinity problems of about 271,836 hectares’ gross area of […]

Future Construction

FEASIBILITY STUDY, DETAILED ENGINEERING DESIGN, TENDER DOCUMENTS AND PC-I FOR JACOBABAD, SHIKARPUR AND KASHMORE DRAINAGE PROJECT

Location Jacobabad, Kashmore and Shikarpur Districts of Sindh province. Scope of Work To provide new surface drainage in Jacobabad & Kashmore and up-gradation of existing drainage network in the project area of Shikarpur to cater water logging and salinity problems of about 697,912 hectares gross area of the Jacobabad, Shikarpur and Kashmore Districts.   Executing

Future Construction

Mangla Marala Link Canal Project

The proposed Canal will off-take from the existing Bong Canal in District Mirpur, Azad Jammu & Kashmir (AJ&K). Canal Head Regulator will be located about 8 km downstream of Mangla Dam on New Bong Canal adjacent to Upper Jhelum Canal (UJC). Expected commencement date is January 2019 and it is to be completed by December

Future Construction

Yulbo HPP

Yulbo HPP ​The proposed dam site is located about 6 km upstream of Silbu and Hilbu villages and about 1.0 km downstream of Astaknala. The powerhouse site is to be located 15 km downstream of dam site and 630 km from Islamabad. Salient Features: Dam Type Rock-Fill with Concrete Face or Concrete Gravity Dam Power

Future Construction

Tungus Hydropower

The project area is located in a largely unpopulated area of Rondu valley, district Skardu. The dam site was identified on Indus River 54 km downstream of Skardu city and 0.5 km upstream of Tungas village. The powerhouse site is to be located 15 km downstream of dam site and 3 km upstream of Dambu

Future Construction

Attabad Lake Hydropower Project

The project is located on Hunza River, 27 km upstream of Aliabad ,130 km from Gilgit and 740 km North East of Islamabad.​​ Salient Features: Intake Gated Intake Tunnel Length 2.3 km (dia 5.5 m) Gross Head 111.7 m Generation Capacity 54 MW Annual Energy 373.69 GWh

Future Construction

Phandar Hydropower

The project is located on Ghizer River near Phandar Lake to Chhashi Gol, 160 km North-West of Gilgit-Chitral Road and 772 km from Islamabad.It has an installed capacity of 80 MW and annual energy generation of 374 GWh.

Future Construction

Basho Hydropower

The project is located on Basho Lungma (Nullah) near Basho Village, 45 km downstream of Skardu Town. Basho Lungma is a left tributary of Indus River and is 704 km from Islamabad. (Gilgit-Baltistan). Salient Features: Design Discharge 5.0 m3/sec Gross Head 974 m Installed Capacity 40 MW Annual Energy 165 GWh          

Future Construction

Thakot Hydropower

The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020. Salient Features: Design Discharge 3,400 m3/sec Gross Head 159 m Installed Capacity        

Future Construction

Patan Hydropower

The project is located on On Indus River about 3 km upstream of village Patan, 5km downstream of Keyal Khwar in KP Province. The powerhouse is situated on the left bank near Patan Village, 305 Km from Islamabad. It has a proposed installed capacity of 2400 MW and annual energy generation of 12,500 GWh.