Future Construction

Bhimber Dam Project

The project is located on Bhimber Nullah about 10 km u/s of Bhimber-Gujrat Road Bridge in District Bhimber, Azad Kashmir. The proposed commencement date is January 2023 and it is to be completed by December 2025. Salient Features: Type of Dam Earth & Rockfill Height of Dam 200 ft (60.96 m) Gross Storage 40,000 AF […]

Future Construction

Chiniot Dam Project

The dam site is located on Chenab river about 5 km from the Chiniot city, District Chiniot and approximately 100 meter u/s of existing Railway Bridge. With a detailed engineering design, the project is proposed to be completed in December 2023. Salient Features: Type of Dam Earth Rockfill Height of Dam 17 m (55.78 ft.)

Future Construction

Harpo

Harpo is located on Harpo Nullah, a left tributary of Indus River, about 75 km north west of Skardu District, Gilgit-Baltistan and 670 km North-east of Islamabad. While Phase 1 was completed in December 2022, Phase 2 is still under construction. Design Discharge 5.8 m3/sec Installed Capacity 34.5 MW Annual Energy 170 GWh   

Scroll to Top