News

Mohmand Dam Hydropower Project

Construction work progressing at a faster pace on all work fronts including Main Dam, Spillway, Power House, Irrigation System etc. After completion of the Main Dam, electricity generation likely to commence in December 2027; Mohmand Dam to store 1.29 MAF water and generate 800 MW clean, green, affordable electricity

News

Chairman WAPDA Visits WAPDA Administrative Staff College

October 10, 2025: Chairman WAPDA Lt Gen Muhammad Saeed (Retd) today visited the WAPDA Administrative Staff College Islamabad, where he was briefed on the institution’s facilities, academic offerings, and ongoing training programs. The Chairman had a detailed round of the facilities available at the Staff College including the academic block that houses class rooms, computer

News

Mangla Dam filled to maximum; reservoir attains 1242 feet level

October 9, 2025: Mangla Dam, the biggest reservoir in terms of water storage in Pakistan, today filled to its maximum conservation level of 1242 feet above mean sea level. As much as 7.277 MAF of useable water is available in the reservoir. With this development, all three reservoirs i.e. Tarbela, Mangla and Chashma are filled

Operational Projects

Neelum Jhelum

The Project diverts Neelum river water through tunnels at Nauseri about 41 km upstream of Muzaffarabad and out falling in Jhelum River near Chatter Kalas in AJ&K, where the powerhouse is located. With an installed capacity of 969 MW, the dam produces annual energy of 5150 GWh and was completed in 2018. Dam Type Composite

Scroll to Top