The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020.
Salient Features:
| Design Discharge | 3,400 m3/sec |
| Gross Head | 159 m |
| Installed Capacity | 4,814 MW Thakot-I 2,220 MWThakot -II 963 MWThakot -III 1,683 MW |
| Annual Energy | 22,180 GWh |