Shatung Nullah Diversion Project

The Project is located on Deosai Plain at an altitude 3,962 m.a.s.l (13,000 ft.) which is about 27 km (16.7 miles) from the Satpara Dam Project, and 6 km (3.7 miles) south of Skardu Town. It hasan expected completion date of December 2023. The objectives of the project are to increase availability of flows during crop sowing season, generation of additional energy and to increase water supply requirement of Skardu Town.

Salient Features:

Weir Height12m 
Weir Length82.29m 
Closure Height Length 228.58m 
Tunnel Diameter Horse shoe 4m 
Approach Channel Length610m 
Discharge to be Diverted3 cumecs 
Tunnel Length6.5 km 
Alternate open Channel Length17.5 km

​