Located on Golen Gol River, a major tributary of Mastuj River in the District Chitral of KP, Golen Gol Project was completed in 2013 and has an installed capacity of 108 MW.
| Weir Height | 12m |
| Head Race Tunnel Length | 3.8 Km |
| Gross Head | 436m |
| Design Discharge | 30 m3/sec |
| Installed Capacity | 108 MW |