Chashma Right Bank Canal

Chashma Right Bank canal off-takes from Chashma Barrage on its right bank and extends south ward upto Tounsa Barrage on Indus River.

Salient Features:

1. Cultivable Command Area606,000 Acres  /245,240 Hectares
K.P.K366,000 Acres /148,115 Hectares
Punjab240000 Acres /97,125 Hectares
2. i. Length of Canal170 Miles/274 KMs
K.P.K106 Miles/171 KMs
Punjab64 Miles/103 KMs
ii. Distributaries
Nos/Length72 Nos 666 Miles/ 1065 KMs
K.P.K42 Nos 391 Miles /625 KMs
Punjab30 Nos 275 Miles /440 KMs
Stage-I13 Nos 141 Miles/227 KMs
Stage-II15 Nos  105 Miles/168 KMs
Stage-III(K.P.K)14 Nos 145 Miles/230 KMs
Punjab30 Nos 275 Miles /440 KMs
 NoLength in (Ft.)Disch: in (Cusecs)
iii. Flood Carrier Channel
Stage-I
Stage-II

Stage-III
18
22
27
264,000
727,0516
898,834
149,160
140,800
459,000
Total671,888,885748,960
 475.70 KMs. 21,208 Cumecs
3. Discharge Capacity4879 Cusecs/ 138.16 Cumecs
K.P.K3045 Cusecs/86.23 Cumecs
Punjab1,834 Cusecs/ 51.93 Cumecs
4. Financial Status
Approved PC-I (4th Revision)Rs. 17,096.865 Million
Stage-IRs. 2,491 Million
Stage-IIRs. 2,334 Million
Stage-IIIRs. 12,272 Million
DonorsADBKfWGOP
Stage_I79%21%
Stage_II79%21%
Stage_III65%14%21%

Additional Civil Works

A meeting with mid term Review Mission (ADB) was held in Planning Commission, It was decided that 4th Revised PC-I pertaining in CRBC under Loan No. 1146 Pak(SF) should be closed and a new PC-I for execution of GRSC recommended works and clearing the Outstanding Liabilities of completed contracts to be prepared by WAPDA.

In view of foregoing a new PC-I was prepared and have been approved by ECNEC to the const of Rs. 865.834 million with a foreign component of Rs. 684.409 million.

The works are scattered in different places and were bifurcated in small contracts. Almost all the contracts have been completed.