The project is located on Hunza River, 27 km upstream of Aliabad ,130 km from Gilgit and 740 km North East of Islamabad.
Salient Features:
| Intake | Gated Intake |
| Tunnel Length | 2.3 km (dia 5.5 m) |
| Gross Head | 111.7 m |
| Generation Capacity | 54 MW |
| Annual Energy | 373.69 GWh |
