
The dam site is located on Chenab river about 5 km from the Chiniot city, District Chiniot and approximately 100 meter u/s of existing Railway Bridge. With a detailed engineering design, the project is proposed to be completed in December 2023.
Salient Features:
| Type of Dam | Earth Rockfill |
| Height of Dam | 17 m (55.78 ft.) |
| Gross Storage | 0.90 MAF |
| Live Storage | 0.85 MAF |
| Power Generation | 80 MW (274 GWh) |
