Tarbela 5th Extension

Tarbela Dam is located on on Indus River, District Swabi, Khyber Pakhtunkhwa. Tunnel 5 was constructed for the generation of hydropower, employment generation during construction & O&M of the project, development of fisheries and to reduce load shedding. It was completed in May 2026 with a generation capacity of 1530 MW and annual energy of 1347 GWh.

Tunnel 5 (Already Constructed):
PurposeIrrigation
TypeConcrete/steel lined
Length3,675 ft.
Proposed T5 Powerhouse:
Generation Capacity          1,530 MW (Three units 510 MW each)
Annual Energy1347 GWh

​                                                                                                                     