Tarbela Dam is located on on Indus River, District Swabi, Khyber Pakhtunkhwa. Tunnel 5 was constructed for the generation of hydropower, employment generation during construction & O&M of the project, development of fisheries and to reduce load shedding. It was completed in May 2026 with a generation capacity of 1530 MW and annual energy of 1347 GWh.
| Tunnel 5 (Already Constructed): | |
| Purpose | Irrigation |
| Type | Concrete/steel lined |
| Length | 3,675 ft. |
| Proposed T5 Powerhouse: | |
| Generation Capacity | 1,530 MW (Three units 510 MW each) |
| Annual Energy | 1347 GWh |
​