Future Construction

Murunj Dam

The Project is proposed to be built across Kaha Nullah at about 116 km West of District Rajanpur, Punjab. Nearest village is Marri, which is about 15 km from dam site. The commencement date is June 2020 and expected completion date is June 2023. Salient Features: Type of Dam ​Earth Core Rockfill​ Height of Dam […]

Under Construction

THE GREATER KARACHI BULK WATER SUPPLY SCHEME K-IV

Location: ​The Greater Karachi Bulk Water Supply Scheme K-IV was initiated to supply bulk water to the mega city of Karachi from its source at Keenjhar Lake located at Thatta District of Sindh Province. Salient Features: ​​Total length of K-IV​ ​​121 km​ ​Total length of Intake Channel​ ​​0.61 km​ ​Pumping stations​ ​02 Nos.​ ​Filtration Plants​

Under Construction

Tarbela 5th Extension

Tarbela Dam is located on on Indus River, District Swabi, Khyber Pakhtunkhwa. Tunnel 5 was constructed for the generation of hydropower, employment generation during construction & O&M of the project, development of fisheries and to reduce load shedding. It was completed in May 2026 with a generation capacity of 1530 MW and annual energy of

Under Construction

Diamer Basha Dam

Located nn the Indus River near Chilas (Khyber Pakhtunkhwa & Gilgit-Baltistan), 315 km u/s from Tarbela Dam and about 40 km downstream of Chilas Town, the completion date for this project is planned to be February 2029. Salient Features: Dam Type Roller Compacted Concrete (RCC) Height of Dam 272 meters Spillways 14.Nos Gate  (11.5m x

Under Construction

Kurram Tangi Dam Project

The project is located on Kurram river in District North Waziristan, KP (previously FATA) about 14 km upstream of Kurram Garhi Headworks and 32 Km North of Bannu District.Completion of Stage 1 of this project is proposed to be in December 2023. Height of Kaitu weir 13 ft. Feeder Tunnel Discharge Capacity 633.4 cusecs Spaira

Under Construction

Nai Gaj Dam

Located on Gaj River in the gorge area at the edge of Kirthar range at about 65 km (40 miles) North-West of Dadu city in Sindh Province, this dam is to be completed in October 2024. Salient Features: Type of Dam Central Core Earth Fill Dam Height of Dam 194 ft Gross Storage 300,000 AF

Operational Projects

Neelum Jhelum

The Project diverts Neelum river water through tunnels at Nauseri about 41 km upstream of Muzaffarabad and out falling in Jhelum River near Chatter Kalas in AJ&K, where the powerhouse is located. With an installed capacity of 969 MW, the dam produces annual energy of 5150 GWh and was completed in 2018. Dam Type Composite

Operational Projects

Hub Dam

The preliminary works of Hub Dam, built across the River Hub, were commenced in September, 1963 and completed in June, 1981. The project was meant to construct a storage reservoir for regulating the flows of Hub River for the purpose of municipal, industrial water supply and irrigation releases to Karachi in Sindh and Lasbela District

Future Construction

Bhimber Dam Project

The project is located on Bhimber Nullah about 10 km u/s of Bhimber-Gujrat Road Bridge in District Bhimber, Azad Kashmir. The proposed commencement date is January 2023 and it is to be completed by December 2025. Salient Features: Type of Dam Earth & Rockfill Height of Dam 200 ft (60.96 m) Gross Storage 40,000 AF