{"id":2906,"date":"2025-11-10T13:19:47","date_gmt":"2025-11-10T08:19:47","guid":{"rendered":"https:\/\/wapda.gov.pk\/?p=2906"},"modified":"2025-11-10T13:19:49","modified_gmt":"2025-11-10T08:19:49","slug":"thakot-hydropower","status":"publish","type":"post","link":"https:\/\/wapda.gov.pk\/?p=2906","title":{"rendered":"Thakot Hydropower"},"content":{"rendered":"\n<p>The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Salient Features:<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Design Discharge<\/strong><\/td><td>3,400 m3\/sec<\/td><\/tr><tr><td><strong>Gross Head<\/strong><\/td><td>159 m<\/td><\/tr><tr><td><strong>Installed Capacity<\/strong><\/td><td>&nbsp; &nbsp; &nbsp; &nbsp; &nbsp;4,814 MW Thakot-I&nbsp;&nbsp;&nbsp; 2,220 MWThakot -II&nbsp;&nbsp;&nbsp;&nbsp; 963 MWThakot -III 1,683 MW<\/td><\/tr><tr><td><strong>Annual Energy<\/strong><\/td><td>22,180 GWh<\/td><\/tr><\/tbody><\/table><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020. Salient Features: Design Discharge 3,400 m3\/sec Gross Head 159 m Installed Capacity &nbsp; &nbsp; &nbsp; &nbsp; [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[95],"tags":[],"class_list":["post-2906","post","type-post","status-publish","format-standard","hentry","category-future-construction"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Thakot Hydropower - Water and Power Development Authority<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wapda.gov.pk\/?p=2906\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Thakot Hydropower - Water and Power Development Authority\" \/>\n<meta property=\"og:description\" content=\"The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020. Salient Features: Design Discharge 3,400 m3\/sec Gross Head 159 m Installed Capacity &nbsp; &nbsp; &nbsp; &nbsp; [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wapda.gov.pk\/?p=2906\" \/>\n<meta property=\"og:site_name\" content=\"Water and Power Development Authority\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/wapda.pr\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-10T08:19:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-10T08:19:49+00:00\" \/>\n<meta name=\"author\" content=\"Hira Bilal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@wapda_pr\" \/>\n<meta name=\"twitter:site\" content=\"@wapda_pr\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hira Bilal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/wapda.gov.pk\/?p=2906#article\",\"isPartOf\":{\"@id\":\"https:\/\/wapda.gov.pk\/?p=2906\"},\"author\":{\"name\":\"Hira Bilal\",\"@id\":\"https:\/\/wapda.gov.pk\/#\/schema\/person\/8de8c2da1e8ccaa30f7c867c5c247634\"},\"headline\":\"Thakot Hydropower\",\"datePublished\":\"2025-11-10T08:19:47+00:00\",\"dateModified\":\"2025-11-10T08:19:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/wapda.gov.pk\/?p=2906\"},\"wordCount\":73,\"publisher\":{\"@id\":\"https:\/\/wapda.gov.pk\/#organization\"},\"articleSection\":[\"Future Construction\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wapda.gov.pk\/?p=2906\",\"url\":\"https:\/\/wapda.gov.pk\/?p=2906\",\"name\":\"Thakot Hydropower - Water and Power Development Authority\",\"isPartOf\":{\"@id\":\"https:\/\/wapda.gov.pk\/#website\"},\"datePublished\":\"2025-11-10T08:19:47+00:00\",\"dateModified\":\"2025-11-10T08:19:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/wapda.gov.pk\/?p=2906#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wapda.gov.pk\/?p=2906\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wapda.gov.pk\/?p=2906#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/wapda.gov.pk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Thakot Hydropower\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wapda.gov.pk\/#website\",\"url\":\"https:\/\/wapda.gov.pk\/\",\"name\":\"Water and Power Development Authority\",\"description\":\"Our Vision- Dam a Decade\",\"publisher\":{\"@id\":\"https:\/\/wapda.gov.pk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wapda.gov.pk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/wapda.gov.pk\/#organization\",\"name\":\"Water and Power Development Authority\",\"url\":\"https:\/\/wapda.gov.pk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/wapda.gov.pk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/wapda.gov.pk\/wp-content\/uploads\/2025\/10\/black-logo-1.png\",\"contentUrl\":\"https:\/\/wapda.gov.pk\/wp-content\/uploads\/2025\/10\/black-logo-1.png\",\"width\":72,\"height\":68,\"caption\":\"Water and Power Development Authority\"},\"image\":{\"@id\":\"https:\/\/wapda.gov.pk\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/wapda.pr\/\",\"https:\/\/x.com\/wapda_pr\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/wapda.gov.pk\/#\/schema\/person\/8de8c2da1e8ccaa30f7c867c5c247634\",\"name\":\"Hira Bilal\",\"sameAs\":[\"https:\/\/new.wapda.gov.pk\"],\"url\":\"https:\/\/wapda.gov.pk\/?author=3\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Thakot Hydropower - Water and Power Development Authority","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wapda.gov.pk\/?p=2906","og_locale":"en_US","og_type":"article","og_title":"Thakot Hydropower - Water and Power Development Authority","og_description":"The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020. Salient Features: Design Discharge 3,400 m3\/sec Gross Head 159 m Installed Capacity &nbsp; &nbsp; &nbsp; &nbsp; [&hellip;]","og_url":"https:\/\/wapda.gov.pk\/?p=2906","og_site_name":"Water and Power Development Authority","article_publisher":"https:\/\/www.facebook.com\/wapda.pr\/","article_published_time":"2025-11-10T08:19:47+00:00","article_modified_time":"2025-11-10T08:19:49+00:00","author":"Hira Bilal","twitter_card":"summary_large_image","twitter_creator":"@wapda_pr","twitter_site":"@wapda_pr","twitter_misc":{"Written by":"Hira Bilal","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wapda.gov.pk\/?p=2906#article","isPartOf":{"@id":"https:\/\/wapda.gov.pk\/?p=2906"},"author":{"name":"Hira Bilal","@id":"https:\/\/wapda.gov.pk\/#\/schema\/person\/8de8c2da1e8ccaa30f7c867c5c247634"},"headline":"Thakot Hydropower","datePublished":"2025-11-10T08:19:47+00:00","dateModified":"2025-11-10T08:19:49+00:00","mainEntityOfPage":{"@id":"https:\/\/wapda.gov.pk\/?p=2906"},"wordCount":73,"publisher":{"@id":"https:\/\/wapda.gov.pk\/#organization"},"articleSection":["Future Construction"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/wapda.gov.pk\/?p=2906","url":"https:\/\/wapda.gov.pk\/?p=2906","name":"Thakot Hydropower - Water and Power Development Authority","isPartOf":{"@id":"https:\/\/wapda.gov.pk\/#website"},"datePublished":"2025-11-10T08:19:47+00:00","dateModified":"2025-11-10T08:19:49+00:00","breadcrumb":{"@id":"https:\/\/wapda.gov.pk\/?p=2906#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wapda.gov.pk\/?p=2906"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/wapda.gov.pk\/?p=2906#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/wapda.gov.pk\/"},{"@type":"ListItem","position":2,"name":"Thakot Hydropower"}]},{"@type":"WebSite","@id":"https:\/\/wapda.gov.pk\/#website","url":"https:\/\/wapda.gov.pk\/","name":"Water and Power Development Authority","description":"Our Vision- Dam a Decade","publisher":{"@id":"https:\/\/wapda.gov.pk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wapda.gov.pk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/wapda.gov.pk\/#organization","name":"Water and Power Development Authority","url":"https:\/\/wapda.gov.pk\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wapda.gov.pk\/#\/schema\/logo\/image\/","url":"https:\/\/wapda.gov.pk\/wp-content\/uploads\/2025\/10\/black-logo-1.png","contentUrl":"https:\/\/wapda.gov.pk\/wp-content\/uploads\/2025\/10\/black-logo-1.png","width":72,"height":68,"caption":"Water and Power Development Authority"},"image":{"@id":"https:\/\/wapda.gov.pk\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/wapda.pr\/","https:\/\/x.com\/wapda_pr"]},{"@type":"Person","@id":"https:\/\/wapda.gov.pk\/#\/schema\/person\/8de8c2da1e8ccaa30f7c867c5c247634","name":"Hira Bilal","sameAs":["https:\/\/new.wapda.gov.pk"],"url":"https:\/\/wapda.gov.pk\/?author=3"}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false},"uagb_author_info":{"display_name":"Hira Bilal","author_link":"https:\/\/wapda.gov.pk\/?author=3"},"uagb_comment_info":0,"uagb_excerpt":"The project sites for Thakot I, II, and III are located 4km upstream of Besham, 12km downstream of Besham (Tentative), and 15km downstream of Thakot (tentative) respectively. According to feasibility study, completion date is proposed to be March 2020. Salient Features: Design Discharge 3,400 m3\/sec Gross Head 159 m Installed Capacity &nbsp; &nbsp; &nbsp; &nbsp;&hellip;","_links":{"self":[{"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=\/wp\/v2\/posts\/2906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2906"}],"version-history":[{"count":1,"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=\/wp\/v2\/posts\/2906\/revisions"}],"predecessor-version":[{"id":2907,"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=\/wp\/v2\/posts\/2906\/revisions\/2907"}],"wp:attachment":[{"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2906"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2906"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wapda.gov.pk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}