MUNDA DAM PROJECT |
|
1. LOCATION |
This project is proposed to be constructed on Swat River about 5 Km
upstream of Munda Head works in Mohmand Agency FATA Khyber
Pakhtunkhwa. |
|
2.
OBJECTIVES |
.Flood Mitigation
.Irrigated Agriculture development of 6,110 Heactares (15,097
acres), further enhancement of command area will
be assessed as per request of Govt of Khyber Pakhtunkhwa.
.Hydropower
generation (Installed Capacity 740 MW, Generation 2407 Gwh
Annually).
.Socio-economic uplift of People of the area. |
|
3. SALIENT FEATURES |
|
|
Type of Dam |
Concrete Faced Rock Fill Dam |
|
Height of Dam |
213 m |
|
Gross Storage |
1.290 MAF |
|
Live Storage |
0.676 MAF |
|
Dead Storage |
0.314 MAF |
|
Flood Storage |
300 Million m3 |
|
Power House Installed Capacity (Peak) |
740 MW |
|
Annual Energy |
2407 GWh |
|
Right Bank Culturable
Command Area |
10,057 Acres |
|
Left Bank Culturable Command Area |
5,040 Acres |
|
Project Cost (year 2011) |
US
$ 1,746 Million |
|
Detailed Engineering Design Period |
2
years (Starting 2012) |
|
Construction Period |
7
Years |
|
4. CURRENT STATUS |
1. Feasibility
completed in March 2000.
2. Ministry of Water & Power awarded review of feasibility study of
the project to M/s AMZO. AMZO submitted
feasibility study to PPIB as Power
Project in 2006.
3. Govt of Khyber Pakhtunkhwa & WAPDA advocated for Munda Dam as
Multipurpose Project and raising of dam
to accommodate flood mitigation and irrigation.
4. The Ministry of Water & Power reassigned Munda Dam Project to
WAPDA for carrying out detailed
engineering design and construction of the
project.
5. Revised PC-II amounting to Rs. 648 million approved by CDWP
subject to availability of foreign funding US $
7.6 Million required for Detailed Engineering Design.
6. EOI for short listing of Consultants for detailed engineering
design and preparation of tender documents
invited/received on November 23, 2010. Nine Firms/Joint
Ventures submitted EOI documents. 05 Firms/JVs
short listed and RFP issued to short listed firms.
7. Three firms/JVs Submitted proposals on July 06,2011 i. Hydrochina Zhongnan - PCA JV, (ii).
SMEC-NK- NESPAK - ACE JV (iii) LI - COBA - NDC - BARQAAB JV).
8. Technical & Financial proposals of M/s SMEC -NK- NESPAK - ACE JV
have been approved by the Authority at
Consultancy cost of Rs. 611.51 Million.
9. The Contract Agreement for Consultancy services likely to be
signed by January 2012.
10.World Bank Afd, Approached through EAD for financing. Moreover
MoW&P has been requested for PSDP
allocations. |
|
Updated as on 31.12.2011 |