BASHO HYDROPOWER PROJECT |
|
Location |
|
The proposed scheme is along 1 km lower
stretch of Basho Lungma, a left tributary of Indus
River. The confluence of Basho Lungma with Indus River
is located about 40 km north-west of Skardu town and 704
km north-east of Islamabad. |
 |
|
Scope
of Work |
|
Updation
of Feasibility Study Detailed Engineering Design and
preparation of tender documents. |
|
Objectives/Benefits |
|
To design
a power house of 28 MW Hydropower
Project to produce mean annual hydroelectricity of 135 GWH. |
|
Date of
Commencement |
|
October 2010 |
|
Date of
Completion |
|
April
2010 |
|
Project
Cost As Per PC-II |
|
PC-II of
the Project approved by CDWP on 27.11.2006 for Rs.91.243
Million. |
|
SALIENT FEATURES |
|
Installed
Capacity MW |
28
|
|
Design
Discharge m3/sec |
3.5 |
|
Gross Head
M |
949 |
|
No. & Type
of units (Pelton) |
3
Pelton (Horizontal Type) |
|
Mean
Annual Energy GWH |
135 |
|
Project
Base Cost |
US$ 40.08
Million |
|
PRESENT STATUS
|
. Feasibility
study was completed by HPO (WAPDA) in collaboration
with GTZ of Germany in 2001.
. Later on it
was decided to update / review the feasibility
study with the grant from M/s AfD of France. The
process for appointment of consultants for
review / updation of feasibility study is in
progress.
Incharge
of the Project
Engr. Maqsood Shaffiq Qureshi
General Manager (Hydro) Planning
Wapda Sunny View, Lahore.
Contact No. 99202717
Mobile No. 0333-4691464
|
|
Updated
30.06.2010
|