English Chinese (Simplified) Urdu 

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/water-sector/under-construction/kachhi-canal-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/water-sector/ready-for-construction/pelar-dam-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/water-sector/future/hingol-dam-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/ready-for-construction/mohmand-dam-hydropower-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/golen-gol-hydropower-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/keyal-khwar-hydropower-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/neelum-jhelum/item/423-environment-social-resettlement-works): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/neelum-jhelum/item/422-salient-features): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/neelum-jhelum/item/421-resettlement-construction-of-composite-model-villages): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/neelum-jhelum/item/419-land-category-wise-rates-for-dhpp-chronological-occurrence-of-events): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/tarbela-5th-extension): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/tarbela-4th-extension-hydropower-project): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/under-construction/neelum-jhelum/item/370-land-acquisition): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895

Warning: file_get_contents(http://graph.facebook.com/?ids=http://wapda.gov.pk/index.php/projects/hydro-power/ready-for-construction/diamer-basha-dam): failed to open stream: HTTP request failed! HTTP/1.1 403 Forbidden in /home/wnppitc/public_html/plugins/content/bt_socialshare/bt_socialshare.php on line 895
Under Construction

Under Construction (23)

Location

Districts: Muzaffar Garh, D.G.Khan & Rajanpur of Punjab.

Districts: Dera Bugti, Naseerabad, Bolan & Jhal Magsi of Balochistan.

Kachhi Canal 3
Scope of Work The main objective of the Project is to provide sustainable irrigation water supply to 7,13,000 acres of agricultural land so as to increase agricultural production and uplift the socio economic condition of the inhabitants. However, a cultureable command area is reduced to 72,000 acres of Phase-I (Part A&B) of Distt: Dera Bugti.
Project Benefits ● Irrigation supplies for 72,000 acres new fertile area on RHS of Pat Feeder Canal.
● Employment opportunities
● Increase in the value of land
● Increase in exports and foreign exchange earning.
● Reduction in migration from Project to Urban areas.
● Increase in revenue to the Government.
● Enhanced production of food grain and oilseeds.
● Availability of drinking Water.
● Cropping intensity shall increase from existing 4% to 80%.
● Agricultural benefits are estimated to be Rs. 5 Billion per year.
Length of Canal Lining 351 Km
Salient Features

 Total Length of main Canal (Phase-I) 363 Km

a. Canal in Punjab 282 Km
b. Canal in Balochistan 81 Km.

 Structure

a. Major 172 Nos.

b. Minor 735 Nos.
Commencement Date 04.10.2002 (As per PC-I)
Completion Date 31.12.2017 (Phase-I)
Financial Status Local (Rs. Million) FEC (Rs. Million) Total (Rs. Million)
Approved PC-I Cost  
Original PC-I Cost 31,204.00 0 31,204.00
1st Revised PC-I Cost 57,562.00 0 57,562.00
2nd Revised PC-I Cost  80,352.00 0 80,352.00
PSDP Allocation (FY 2016-17)  9,115.00 0 9,115.00
Status  Punjab Province (Part-A)
● Contract KC-01, KC-2, KC-3 & KC-4A completed.
● Contract KC-04 (95.11%)
● Contract KC-04B (36.77%)
● Contract KC-05, KC-5A(R), KC-5(B) & KC-5(C) completed, KC-05(D) 96.30%
 Balochistan Province (Part-A)
● Contract KC-6A(R), KC-6A(2R), KC-6A(3R) & KC-6C(1R) Completed.
 Balochistan Province (Part-B)
● Contract KC-6B (1R) 87.92%
● Physical Progress Phase-I (Part-A) = 97.45% (RD 0 to RD 1126)
● Physical Progress Phase-I (Part-B) = 87.92% (RD 1126 to RD 1193)
● Overall Finacnial Progress = 80.33%

Incharge Of The Project      

          Chief Engineer/PD

          Kachhi Canal Project

Friday, 13 January 2017 05:18

Pelar Dam Project

Written by
Location
The proposed dam site is located across Nal River about 30 Km upstream from Korek Pelar Village in District Awaran of Balochistan
Salient Features
Dam Type Concrete Gravity
Height of Dam 60 ft
Gross Storage Capacity 99,175 AF
CCA 25,650 Acres
Power Generation 300 KW
Execution by WAPDA
Commencement Date July, 2009
Completion Date The work was suspended due to non allocation in
PSDP 2014-15. Completion date could not be confirmed at this stage.
Financial Status Local (Rs. Million) FEC (Rs. Million) Total  (Rs. Million)
Original PC-I Cost

1692.820

- 1692.820
1st Revised PC-I Cost 874.00 - 874.00

Status                                Construction will be started after:-

                                                     -Prioritization of project by Govt. of Balochistan

                                                     -Availability of funds

                                                     -Improvement in security conditions in the area

Incharge of the Project    General Manager (Hydro) Planning

Friday, 13 January 2017 04:16

Hingol Dam Project

Written by
Location
The proposed Hingol Dam is located on Hingol River at a distance of 19 km on North of the Makran Coastal Highway and about 248 km from north-west of Karachi in Lasbela district of Balochistan.
Salient Features
Dam Type Earth & Rockfill
Height of Dam 174 ft
Gross Storage Capacity 1.206 MAF
Live Storage Capacity 0.658 MAF
CCA 65,000 Acres
Power Generation 1.37 MW
Execution by WAPDA
Donor Agency Govt. of Pakistan through PSDP
Commencement Date January, 2010
Completion Date Not yet commenced
Financial Status Local (Rs. Million) FEC (Rs. Million) Total  (Rs. Million)
Original PC-I Cost 272.824 - 272.824

Status

                          Detailed Engineering Design and Preparation of PC-1 & Tender Documents is in progress

Incharge of the Project    General Manager (Hydro) Planning

Mohmand Dam Hydropower Project

 Location: 

 This project is proposed to be constructed on Swat River about 5 km upstream Munda Head Works in Muhammand Agency FATA, Khyber  Pakhtunkhwa
 Salient Features
 Dam Type  Concrete faced rockfill
 Height of Dam  700 ft
 Storage Capacity  1.293 MAF         
 Live Storage Capacity   0.676 MAF       
 CCA  16,737 Acres
 Power Generation

 800 MW

 Execution by  WAPDA
 Donor Agency  Rs.122.860 million by GoP and Rs. 815 million by afd
 Commencement Date  June, 2012
 Completion Date  September, 2016
 Financial Status Local (Rs. Million) FEC (Rs. Million) Total (Rs. Million)
 Original PC-I Cost 122.860 815.000 937.960
 PSDP Allocation Fy 2015-16 5.000 200.000

205.000 (Request for 

additional allocation

amounting to Rs.600 

million for FY 2016-17

has been submitted to

GMF-W)

 

Status

  Detailed Engineering Design and Preparation of PC-1 & Tender Documents is in progress

Incharge Of The Project      General Manager (Hydro) Planning

 

 

 



Location: District Chitral, Khyber Pukhtunkhwa
 Salient Features
Weir Height 12.00m
Length Of Tunnel 3.8 Km
Gross Head 436 m
Desighn Discharge 30 m3/Sec
Installed Capacity 108 MW
Objectives To Generate Electricity
Execution By WAPDA
Dam Type Weir / Run of River Project
Execution By WAPDA
Supervision Consultants Joint Venture of M/s. Fichtner Germany, M/s. PES Pakistan, M/s BAK Pakistan & M/s DMC Pakistan
Contractors
LOT-2(Civil work) M/S SAMBU SARCO (JV)
LOT-3.1 (Civil Works of PowerHouse) M/S SAMBU SARCO (JV)
LOT-3.2 (E&M Works) M/S Andritz
LOT-4 Package-1 & 2 (T/Line) M/S NETRACON
Donor Agency
Saudi Fund (Lot-2) Us $40+57.800=97.8 Million
Kuwait Fund for Lot 3.1 &3.2 US $ 37 Million
OFID Fund (Lot-4 Pak-1&2) US $ 30 Million
Commencement Date July 2002 / 01.02.2011
Completion Date June 2006 / Expected August, 2017
Financial Status Local (Rs. Million) FEC (Rs. Million) Total (Rs. Million)
Approved PC-I Cost 02.09.2002   4397.008 2638.120 7035.128
PSDP Allocation 2016-17 980 1749 2729
Original PC-I Cost Rs. 7035.128 Million
Revised PC-I Cost Rs. 29077.701 Million Approved on30.09.2016

 

Status                               

Overall physical progress is 67.09%

 

Incharge of the Project

 Engr. Muhammad Javed Afridi Chief Engineer/PD

Location: The Project is located on Keyal Khwar, a right bank tributary of Indus River in Lower Kohistan District in Khyber Pakhtunkhwa and 310 Km from Islamabad.
Salient Features
Dam Type Concrete Gravity dam
Height of Dam ( weir) 37.5 m
Head 732 m
Gross Storage Capacity 206.732 AF
Live Storage Capacity 158.089 AF
Design discharge 20 Cumecs
CCA NA
Power Generation 128 MW (418 GWh )
Execution by Pakistan, Water & Power Development Authority (WAPDA)
Supervision Consultants Keyal Hydropower Consultants-JV , Lahmeyer International as leading firm
Contractor

Contract KKHPP-01 ( Powerhouse ventilation tunnel Exploratory Adit)  , M/s Sarwar & Co. Private Limited 

Contract KKHPP-02 ( Civil Works), M/s Sinohydro- Hajvairy JV

Donor Agency
  • GOP
  • Kreditanstalt für Wiederaufbau (KFW) Bank, Germany.
  • European Investment bank  (EIB)
Commencement Date
  • 13th August 2016
Completion Date
  • 12th August 2020
Financial Status Local                        (Rs. Millions) FEC                  (Rs. Millions) Total                (Rs. Millions)
Original PC-I Cost 4,034.881 3,032.080 7,066.961
1st Revised PC-I Cost 16,814.880 10,988.140 27,803.010
2nd Revised PC-I Cost 16,719.703 9,364.475 26,084.178
PSDP Allocation Fy ( 2016-17) 1348.000 1690.000 3038.000

 

Status:-

  1. Overall upto date Physical progress of O&M staff colony is 90%.
  2. Contract KKHP-01 completed.
  3. Contract KKHPP-02 (Civil works), 1st half mobilization advance payment made to Civil Contractor.
  4. 2nd Revised PC-I amounting Rs. 26,084.178 Million approved by ECNES on 29.01.2016.

 

Incharge of the Project: CE/Project Director, Keyal Khwar Hydropower Project. 

                                                  (Office shifted to Pattan Kohistan)

Environment, Social & Resettlement Works

Construction of the Project will have varieties of impacts on local communities. These include loss of agricultural and pasture lands due to a project colony facilities and other infrastructures on areas downstream of the dam and reservoir submerged area upstream, and further include loss of residential, commercial, business and community structures, requiring relocation and resettlement of households from 34 villages in the valley.

Land Acquisition

Land areas of 9,917 Acres in total will be acquired for the Project, which includes 353 Acres of agricultural land. A total of 30 villages will be resettled, displacing 6,953 persons. The acquisition will also affect 21,000 trees, including 18,000 bushes and non-fruit bearing trees while 3,000 fruit bearing trees on both sides of the riverbanks.


Current Status

  • Section-4 and Gazette Notification issued for all components of Project by District Collector, Kohistan for total land (9,917 acre) to be acquired for Project by December 2013.
  • The Executive Committee of National Economic Council (ECNEC), in its meeting held on November 14, 2015, approved Land rates for the Dasu Hydropower Project. The rates were already approved by the Project Steering Committee for Project.
  • An amount of Rs. 1,485 Million has been transferred to Account of DC, Kohistan in respect of payments to local affectees for acquisition of land for Project Colony, KKH-01, Contractor Camps at Zaal & Uchar, Grid Station for Transmission line and built-up properties.
  • After extensive efforts made by WAPDA and Ministry of Water & Power, Govt. of Khyber Pakhtunkhwa waived off the 2.5 % Service Charges on July 13, 2016.
  • Contract Agreement between WAPDA and Govt. of Khyber Pakhtunkhwa is finalized and will be signed on August 02, 2016.
  • DC Kohistan has started process of compensation payments. The affectees of Uchhar & Zaal areas received compensation cheques on October 18, 2016. The payment for remaining affected areas will be made to affectees as per agreed timelines.

Resettlement Sites Development

  • For resettlement of 30 Nos. affected villages, total 40 Nos. resettlement sites have been identified at higher elevations. Master Planning of these 40 Nos. sites have been completed for development. Final round of consultation with locals is in progress.
  • Current status of contracts regarding development of Resettlement Sites is as under:

1. Resettlement of Village Chuchang and Construction of Shatial Museum (Dasu-RV-C&S)

Contract Agreement signed between WAPDA and M/s CRFG (China Railway First Group) on December 15, 2015. Contractor has partially mobilized at site due to non-possession of land.Construction of Contractor camp in progress.

2. Resettlement of Villages on Left & Right Banks (Dasu-LBRV-11&12 and Dasu-RBRV-11)

Bids received by deadline August 18, 2016 (1100 hrs) and opened on same day at 1130 hrs in WAPDA Auditorium, WAPDA House Lahore. Six (06) & Four (04) Contractors submitted their bids for LBRV-11 and LBRV-12 respectively. While Five (05) Contractors Submitted their Bids for RBRV-11. Evaluation of Bids is in progress.

 

In Pictures



Salient Features

Installed Capacity (Full Project)                              5,400 MW (15 Units @ 360 MW each)

Annual Energy (Full Project)                                   26,700 GWh            

Installed Capacity (Stage-I)                                     2,160 MW (06 Units @ 360 MW each)

Annual Energy (Stage-I)                                          12,222 GWh

Design Discharge                                                     2,670 m3/sec

Dam Type                                                                 RCC (Gravity)                    

Max. Gross Head                                                     184 m 

Dam Height                                                              242 m

Crest Length                                                            570 m

Spillway Gates                                                          08 Nos

Low Level Outlets (LLOs)                                        09 Nos

Flushing Tunnels                                                     02 Nos (Circular)

Headrace Tunnel                                                     04 Nos (Circular)

Tailrace Tunnel                                                        04 Nos (D-Shaped)

Powerhouse                                                             Underground

Economic & Financial Parameters (Stage-I)

EIRR                                                                            24.79 %

FIRR                                                                            20.04 %

 

 

 

In Pictures



CONSTRUCTION OF COMPOSITE MODEL VILLAGES

Three (3) Composite Model Villages at Thak Das, Harpan Das and Kino Das with all the amenities shall be developed for resettlement of 4228 affected households / families. Each affected households / families shall be given a residential plot of one kanal free of cost. The construction work of Composite Model Village–II (Harpan Das) is planned through 7 contract packages. 5 contracts have been awarded, other contracts are in pipeline. Work at site is in progress.

 

CONSTRUCTION OF BYPASS FROM SHATIAL TO THOR NULLAH TO EXISTING KKH (35 KM) BY NHA AS WAPDA’S DEPOSIT WORK

During Construction of Main Dam the existing KKH is to be used for construction activities while the Bypass on KKH from Shatial to Thor Nullah being constructed by NHA as WAPDA deposit work will be utilized for uninterrupted traffic flow. Contract has been awarded and work is in progress at site.

Land Category-Wise Rates for DHPP Chronological Occurrence of Events

}