Introduction

 

DASU1

Location

Dasu Hydropower Project is a run of river project on the Indus River located 7 km upstream of Dasu Town, District Kohistan, Khyber Pakhtunkhwa. The site is 74 km downstream of proposed Diamer Basha Dam site and 345 km from Islamabad.

 

 

Scope of Work

The Project will be constructed in two Stages (Stage-I&II):

Stage-I: It includes construction of complete RCC Dam with Appurtenant Structures, Underground Powerhouse with Appurtenant Structures, Six (06) Turbo-generators with total installed capacity of 2,160 MW, one double circuit 500 kV transmission line, Relocation of KKH (62 km), Colony, Right Bank Access Roads (81 km), 132 kV Transmission line, Land Acquisition, Resettlement and Environmental & Social Management

Stage-II: It includes construction of underground powerhouse and appurtenant structures, installation of remaining nine (09) units and one double circuit 765 kV transmission line

 

Construction Period                                               5 Years for Stage-I

 

Approved PC-I Cost (Stage-I)                              Rs. 486,093.300 Million

                                                                           (including FEC Rs. 218,547.500 Million)

 

 PSDP 2016-17 Allocation                                    Rs. 42,177 Million

                                                                          (including FEC Rs. 2,000 Million)

 

Incharge of the Project

                                                                          Mr Abdul Zahir Khan Durrani

                                                                          General Manager / PD (Dasu HPP)

                                                                          5th Floor ,AL-Malik Plaza, Davis Road, Lahore

                                                                         Contact # 0092-42-99202676, 0092-300-4649221

 

 