Yulbo HydroPower Project

Yulbo HydroPower Project

Location: The proposed dam site is located about 6 Km upstream of Silbu and Hilbu villages, about 1.0 Km downstream of Astaknala. The powerhouse site is to be located 15 km downstream of dam site and 630 km from Islamabad.
Salient Features;
Dam Type Rock-fill with Concrete face or Concrete Gravity Dam Yulbo
Power Generation 2,800 MW
Annual Generation 11,400 GWh
Execution by WAPDA
Supervision Consultants -
Contractor -
Donor Agency -
Commencement Date -
Completion Date 2 years after commencement
Financial Status

Local

(Rs. Million)

FEC

(Rs. Million)

Total

(Rs. Million)

Original PC-II Cost - - -
1st Revised  PC- II Cost  - - -
PSDP Allocation FY 2018-19 (GoP) - - -

 

Status
  • Yulbo Hydropower Project was identified as part of Inventory and Ranking Study of Hydropower potential on main rivers of Pakistan carried out by Montreal Engineering Company (MONENCO) during 1981-84.
  • The project identified by MONENCO during 1984  was for 710 MW. WAPDA upgraded the capacity to 2800 MW.
  • PC-II amounting to Rs. 971.795 million for Feasibility Study has been updated and will be submitted to Ministry of Water Resources (MoWR) subject to arrangement of financing.
Read 13353 times