Phandar HydroPower Project
Print this page

Phandar HydroPower Project

Location: On Ghizer River near Phandar Lake to Chhashi Gol, 160 km North-West of Gilgit-Chitral Road and 772 km from Islamabad.  (Gilgit-Baltistan)
Salient Features

Installed Capacity

80 MW  PHANDAR

Annual Energy

374 GWH

Objectives

To Generate Electricity

Scope of Work

Construction of  Project including 170 km Transmission Line
Consultants A JV of FHC Consulting Engineers (Lead Firm), Techno Consult, Electra Consultants In Association with Scott Wilson Limited, UK.
Contractor -
Commencement Date -
Completion Date -
Financial Status (Rs. Million) Local Foreign Total
Approved PC-II Cost (30.04.2007) 120.370 - 120.370
PSDP Allocation 2018-2019 - - -

Status

  • Detailed Engineering Design & Preparation of Tender Document of the project was completed in April 2012.
  • PC-I amounting to Rs.17251.5 million has been submitted to Ministry of Water & Power on March 07, 2014 for obtaining approval which is under process.
  • Project would be taken up after arrangement of financing from Donor Agencies.
  • WAPDA will implement the project as a deposit work, whereas GB Govt. will be sponsoring agency.

 Incharge of the Project


Mr. Muhammad Amin
General Manager (Hydro) Planning
Contact No. 0092-42-99202717

 

WAPDA will implement the project as a deposit work, whereas GB Govt. will be sponsoring agency.