Dudhnial Dam Multipurpose Project

Dudhnial Dam Multipurpose Project

Location: The project is located on the right bank of Neelum river, 103 km north east of Muzaffarabad in AJK. Dam site is to be located 2 km upstream of Dudhnial village and Powerhouse near Dowarian village 63 km upstream of N.J. HPP Dam site.
Salient Features
Dam Type RCC Gravity
Height of Dam 210 m
Power Generation 960 MW
Storage 1.0 MAF
Execution by WAPDA
Commencement Date Yet to be Started
Completion Date -
Financial Status

Local

(Rs. Million)

FEC

(Rs. Million)

Total

(Rs. Million)

PC-II Cost 386.385 - 386.385
Status
  • PC-II Proforma for pre-feasibility was submitted to MoWP on 29.09.2009 which after clarification was resubmitted on 20.10.2010. Planning Commission returned the PC-II for cost updation on 05.09.2013.
  • Accordingly feasibility study amounting to Rs. 701.483 million was prepared and Govt of AJK was requested to issue NOC vide letter dated 28.11.2013. Govt of AJ&K conditioned the issuance of NOC with commitment of net hydel profit of Rs. 0.425/unit besides some other demands.
  • NOC for conducting Feasibility Study received from Govt. of AJ&K on 12.10.2017.
  • PC-II submitted to Chairman FFC/Chief Engineering Advisor for review and comments before submission to MoWR on 27.07.2018.
  • PC-II has been cleared from FFC and sent to MoWR on 03.01.2019.

 Incharge of the Project


Mr. Muhammad Amin
General Manager (Hydro) Planning,
Contact No. 0092-42-99202717

Read 1085 times