WINDER DAM PROJECT

1. Location
 

The winder dam is proposed across Winder River about 125 Kms from Lasbela city, about 66 Kms from Uthal in Balochistan.

2. Scope of Work

Government of Pakistan intends to develop land and water resources of the country for irrigated agriculture development, hydropower, flood control, socio economic uplift, and emancipation of poor and needy women of the area.

3. Objectives / Benefits -Irrigation agriculture Development.
-Hydropower Generation.
-Drinking water.
-Ground water recharge.
-Socio-economic uplift.
-Women emancipation.
4. Date of Commencement 2014-15 (Tentative)
5. Date of Completion 2017-18 (Construction Period = 3 Years)
6. Project Cost
    (As per PC-I/PC-II)
Original Approved          Rs. 1.696 Billion
Revised Submitted         Rs. 8.324 Billion
7.Salient Features 102 ft high Earth Core Rock fill Dam will create gross storage of 36,484 AF and this storage will be used to irrigate 10,000 acres of  Culturable Command Area alongwith hydropower generation of 300 KW.
8. Present Status / Progress 1. PC-I amounting to Rs. 1.696 Billion approved by ECNEC  in its meeting held on September
    3,2009.
2. Ground Breaking Ceremony was graced by the President of Pakistan on Jan 01,2010.
3. Tenders for construction on EPC basis opened on September 28, 2009 and Letter of
    Acceptance issued to M/s Techno Engineering - RSWI JV on Feb. 15, 2010.
4. Unsuccessful bidders submitted writ petition in Lahore High Court against award of the
    project.
5. Due to non submission of performance guarantee by the designated Contractor M/s
   Techno Engineering - RSWI JV the letter of Acceptance (LOA) issued has been
    cancelled  along with tendering process.
6. Lahore High Court petition settled against the petitioner.
7. Project will be re-tendered after undertaking detailed engineering design and tender
    documents of the project.
8. Funds amounting to Rs. 1,000 Million required for 2012-13.
9. Revised PC-I amounting to Rs. 8.324 Billion submitted to Ministry of Water & Power for
   arranging approval of ECNEC.
9. Incharge of the Project Mr. Saleem R. Qureshi
Project Director
Winder Dam Project
WAPDA, Hyderabad
(Ph: 021-36635388)
Updated as on 18.06.2012

WINDER DAM PROJECT – LOCATION MAP